March 16, 2020

Ferry News – Delivery Voyage of CHIQUINHO BL – 14.01.2020

The newbuild landing craft type double ended ferry CHIQUINHO BL entered Valletta, Malta on Tuesday 14th January, 2020 at 1716 hrs with Redwise Crew berthing at Valletta Cruise Port Pinto 4 Wharf. She was built in South Korea as yard number 101 in 2019 with keel laying during November 2018 with a length overall of 76 metre …

Ferry News – Delivery Voyage of CHIQUINHO BL – 14.01.2020 Read More »

Ferry News – Delivery Voyage of Newbuild GRIP – 26.01.2020

The newbuild electric double ended ferry GRIP entered Valletta, Malta on Sunday 27th January, 2020 with Redwise Crew berthing at Valletta Cruise Port Pinto 3 Wharf. She was built by Cemre Shipyard in Turkey for the Norwegian operator Fjord1. She left Yalova, Turkey on Wednesday 22nd January, 2020. She’s a Havyard designed vessel, the sistership of TUSTNA …

Ferry News – Delivery Voyage of Newbuild GRIP – 26.01.2020 Read More »