On Tuesday 3rd December 2019 after 1600 hrs the 2004 built LNG tanker BERGE ARZEW performed a conveyance service with Miggiani Offshore Boats MARIA-C and UNDAUNTED.

She was built in South Korea by Daewoo Shipbuilding & Marine Engineering at Geoje with a 93,844 GRT and a deadweight of 77,470 tons. Below Images are of her leaving Valletta from Palumbo Malta Shipyard back to 11th July, 2014.
Images of the 1999 built supply vessel MARIA-C entering Valletta on Tuesday 3 rd December, 2019 –
Images of the 1991 built crew boat UNDAUNTED leaving Valletta on Tuesday 3 rd December, 2019 –
BERGE ARZEW was represented in Malta by Medsea Shipping Agency – http://www.medsea.com.mt

Featured Aerial image is back to Friday 29th November, 2019 underway offshore Sicily.
Photos by Capt. Lawrence Dalli. Do not use these images without my permission. © All rights reserved. Malta Ship Photos & Action Photos – www.maltashipphotos.com

Published – Wednesday 4th December 2019